Hokkaido-Sakhalin Cable System (HSCS): 0.02× baseline latency
What we measured
| Cable | Hokkaido-Sakhalin Cable System (HSCS) |
| Segment | Ishikari, JP → Nevelsk, RU |
| Detected | 2026-04-30 17:01 UTC |
| Resolved | 2026-04-30 20:00 UTC |
| Duration | 2h 59m |
| Observed latency | 1.6 ms |
| Baseline | 67.9 ms · 0.02× |
| Increase | +231% |
| Severity | warning |
Who is affected
Countries where Hokkaido-Sakhalin Cable System (HSCS) comes ashore, how much of their submarine diversity this cable represents, and what our measurements into them show.
| Country | Dependence on this cable | Other submarine cables | What the measurements show |
|---|---|---|---|
| Japan resilience index: 100 · resilient |
1 of 52 cables (2% of submarine diversity) | 5 Villages 6 Islands, APCN-2, Apricot +48 more | median 186 ms today vs 250 ms over 30 days (70 routes) - faster |
| Russia resilience index: 100 · resilient |
1 of 13 cables (8% of submarine diversity) | BCS North - Phase 2, Energy Bridge Cable, Far East Submarine Cable System +9 more | median 124 ms today vs 79 ms over 30 days (213 routes) - slower |
Dependence is structural (share of the country's submarine cables), not a traffic share: real traffic distribution across cables is not public.
Path analysis
Traffic kept the same route. Latency rose without a visible path change, which points at congestion or a fault on the existing route rather than a reroute.
Cross-probe verdict. Only one probe saw it. We treat this as a probable false positive and label it as such.
Timeline
- Alert 2026043002: warning - ratio 3.31x
- Alert #100 resolved: RTT 1.6ms (baseline 67.87ms), 6 consecutive OK
Detection method
Latency is sampled continuously from our probe network. An alert opens when round-trip time to a monitored endpoint holds above its rolling baseline, and closes automatically once it returns. Full method is described on the methodology page.