Isla Verde: Subsea Cable Hub and Maritime Challenges

📈 Live RTT from our measurements · last 30 days
Daily average per cable, in ms; red dots mark days with detected anomalies.
05010015020025026.0702.0809.0816.0823.08Pacific Caribbean Cable System (PCCS) · 26.07 · 103 msPacific Caribbean Cable System (PCCS) · 27.07 · 104 msPacific Caribbean Cable System (PCCS) · 29.07 · 112 msPacific Caribbean Cable System (PCCS) · 30.07 · 104 msPacific Caribbean Cable System (PCCS) · 31.07 · 109 msPacific Caribbean Cable System (PCCS) · 01.08 · 113 msPacific Caribbean Cable System (PCCS) · 02.08 · 109 msPacific Caribbean Cable System (PCCS) · 03.08 · 120 msPacific Caribbean Cable System (PCCS) · 04.08 · 183 msPacific Caribbean Cable System (PCCS) · 05.08 · 102 msPacific Caribbean Cable System (PCCS) · 06.08 · 115 msPacific Caribbean Cable System (PCCS) · 07.08 · 112 msPacific Caribbean Cable System (PCCS) · 08.08 · 112 msPacific Caribbean Cable System (PCCS) · 09.08 · 113 msPacific Caribbean Cable System (PCCS) · 10.08 · 112 msPacific Caribbean Cable System (PCCS) · 11.08 · 112 msPacific Caribbean Cable System (PCCS) · 12.08 · 107 msPacific Caribbean Cable System (PCCS) · 13.08 · 113 msPacific Caribbean Cable System (PCCS) · 14.08 · 112 msPacific Caribbean Cable System (PCCS) · 15.08 · 113 msPacific Caribbean Cable System (PCCS) · 16.08 · 106 msPacific Caribbean Cable System (PCCS) · 17.08 · 115 msPacific Caribbean Cable System (PCCS) · 18.08 · 103 msPacific Caribbean Cable System (PCCS) · 19.08 · 115 msPacific Caribbean Cable System (PCCS) · 20.08 · 102 msPacific Caribbean Cable System (PCCS) · 21.08 · 114 msPacific Caribbean Cable System (PCCS) · 22.08 · 112 msPacific Caribbean Cable System (PCCS) · 23.08 · 108 msTAM-1 · 26.07 · 48 msTAM-1 · 27.07 · 72 msTAM-1 · 28.07 · 48 msTAM-1 · 29.07 · 59 msTAM-1 · 30.07 · 85 msTAM-1 · 31.07 · 98 msTAM-1 · 01.08 · 53 msTAM-1 · 02.08 · 53 msTAM-1 · 03.08 · 74 msTAM-1 · 04.08 · 139 msTAM-1 · 05.08 · 146 msTAM-1 · 06.08 · 62 msTAM-1 · 07.08 · 78 msTAM-1 · 08.08 · 70 msTAM-1 · 09.08 · 71 msTAM-1 · 10.08 · 72 msTAM-1 · 11.08 · 53 msTAM-1 · 12.08 · 73 msTAM-1 · 13.08 · 47 msTAM-1 · 14.08 · 62 msTAM-1 · 15.08 · 72 msTAM-1 · 16.08 · 92 msTAM-1 · 17.08 · 71 msTAM-1 · 18.08 · 139 msTAM-1 · 19.08 · 64 msTAM-1 · 20.08 · 69 msTAM-1 · 21.08 · 55 msTAM-1 · 22.08 · 71 msTAM-1 · 23.08 · 71 msSouth America-1 (SAm-1) · 27.07 · 113 msSouth America-1 (SAm-1) · 28.07 · 113 msSouth America-1 (SAm-1) · 29.07 · 113 msSouth America-1 (SAm-1) · 30.07 · 178 msSouth America-1 (SAm-1) · 31.07 · 127 msSouth America-1 (SAm-1) · 01.08 · 143 msSouth America-1 (SAm-1) · 02.08 · 159 msSouth America-1 (SAm-1) · 03.08 · 130 msSouth America-1 (SAm-1) · 04.08 · 140 msSouth America-1 (SAm-1) · 05.08 · 100 msSouth America-1 (SAm-1) · 06.08 · 130 msSouth America-1 (SAm-1) · 07.08 · 130 msSouth America-1 (SAm-1) · 08.08 · 129 msSouth America-1 (SAm-1) · 09.08 · 129 msSouth America-1 (SAm-1) · 10.08 · 129 msSouth America-1 (SAm-1) · 11.08 · 126 msSouth America-1 (SAm-1) · 13.08 · 129 msSouth America-1 (SAm-1) · 14.08 · 128 msSouth America-1 (SAm-1) · 15.08 · 128 msSouth America-1 (SAm-1) · 17.08 · 128 msSouth America-1 (SAm-1) · 18.08 · 139 msSouth America-1 (SAm-1) · 21.08 · 123 msSouth America-1 (SAm-1) · 23.08 · 123 msARCOS · 28.07 · 63 msARCOS · 30.07 · 76 msARCOS · 01.08 · 70 msARCOS · 02.08 · 70 msARCOS · 04.08 · 192 ms · anomalyARCOS · 04.08 · 192 msARCOS · 05.08 · 88 msARCOS · 06.08 · 70 msARCOS · 08.08 · 70 msARCOS · 09.08 · 70 msARCOS · 11.08 · 64 msARCOS · 16.08 · 70 msARCOS · 17.08 · 70 msARCOS · 18.08 · 138 msARCOS · 19.08 · 70 msARCOS · 21.08 · 70 msARCOS · 23.08 · 70 ms

Geometry of the Location: Depths, Shores, Shipping

Isla Verde, located at latitude 18.5000 and longitude -66.0000, serves as a key node for submarine cables in the Caribbean region. Geographically, this location is a coastal area of Puerto Rico where complex marine topography and limited options for cable laying force operators to concentrate routes within a narrow corridor. Deep-sea sections of the Atlantic Ocean transition into relatively shallow coastal waters, making the construction of alternative routes technically challenging and costly. The shores of Puerto Rico are also densely developed, limiting the choice of landing points for cables. Additionally, the region's intense shipping activity requires meticulous route planning to avoid cable damage from anchors and trawls.

What’s Packed In: Main Routes and Their Scale

Thirteen submarine cables pass through Isla Verde, connecting North and South America as well as Caribbean nations. Among them are major routes such as South America-1 (SAm-1), spanning 25,000 km, BRUSA (11,000 km), and ARCOS (8,704 km), which provide connectivity between the United States, Brazil, Panama, Colombia and other countries. Shorter but equally significant routes include GTMO-PR (1,400 km) and Taino-Carib (187 km), linking Puerto Rico with neighboring islands. These cables support not only internet services but also critical infrastructure for financial, medical and governmental systems in numerous countries, including the United States, Brazil, the Dominican Republic and Mexico.

Alternative Corridors: Why They Don’t Help

Theoretically, alternative routes for laying cables exist, such as through the eastern Caribbean Sea or along the Central American coastline. However, these options face several challenges. First, increasing the cable length, as in the case of bypassing through eastern waters, leads to higher construction and operational costs. For example, extending a route by 1,000 km could inflate the project budget by tens of millions of dollars. Second, alternative corridors have their own vulnerabilities. Eastern routes are exposed to risks from tropical storms and hurricanes, while western routes face high seismic activity along the Central American coast. Thus, the region's geography effectively compels operators to concentrate cables within the narrow Isla Verde zone.

Break Scenario Step by Step

In the event of a break in one or more cables in the Isla Verde area, the consequences would be felt immediately. In the first few hours, traffic routes would be redirected through backup cables, increasing latency (RTT). For instance, communication between the United States and Brazil might be rerouted via longer paths, such as through Europe, adding tens of milliseconds to response times. Within the first 24 hours, operators would begin assessing the damage and devising a repair plan. If the break affects major cables like SAm-1 or BRUSA, restoration could take weeks due to their length and complexity. During this time, countries such as Puerto Rico, Brazil and the Dominican Republic would face challenges in accessing international resources, including cloud services and financial systems.

What GeoCables Monitors

GeoCables closely monitors the situation in the Isla Verde area. We track the status of all 13 cables, including major routes like SAm-1, BRUSA and ARCOS, as well as shorter paths like Taino-Carib and SMPR-1. The area is also monitored for vessels that may pose threats to cables, such as through anchoring operations. Our systems enable the rapid detection of latency (RTT) changes and anomalies in cable performance. Over the past 30 days, one anomaly was recorded, which did not result in significant disruptions. Continuous monitoring minimizes risks and ensures swift responses to any incidents, which is especially critical in a narrow and congested corridor like Isla Verde.

🗺 The zone on the live map
Open the full map →
⚓ Cables in this zone: live status
From our monitoring network; baseline is the cable's normal RTT.
CableLengthRFSRTT nowBaselineStatus
TAM-17,200 km202671 ms-nominal
ARCOS8,704 km200170 ms70 msnominal
South America-1 (SAm-1)25,000 km2001123 ms-nominal
Pacific Caribbean Cable System (PCCS)6,163 km2015108 ms106 msnominal
Americas-II West-200088 ms-nominal
Sint Maarten Puerto Rico Network One (SMPR-1)375 km200478 ms78 msnominal
GTMO-PR1,400 km201969 ms-nominal
BRUSA11,000 km2018--nominal
Evgeny K.
Written by
Evgeny K.
Infrastructure Engineer · Founder of GeoCables
Built GeoCables to monitor submarine cables in real time. Runs his own distributed network of measurement servers, including in regions poorly covered by public internet measurements.

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?