Home Cables Locations Health Research Guide
HomeLocationsDenmark › TotalEnergies Tyra, Denmark

TotalEnergies Tyra, Denmark

Landing Point · DK Denmark

1 Connected Cables 55.4187°N 4.5131°E Denmark
1
Connected Cables
DK
Country
55.42°
Latitude
4.51°
Longitude
Ctrl + Scroll to zoom
👆 Tap to interact with map

Connected Cables

Cable Length RFS Status
Hronn 270 km 2022 Active

About TotalEnergies Tyra, Denmark

TotalEnergies Tyra, Denmark is a submarine cable landing point in Denmark (coordinates 55.4187°, 4.5131°). It serves 1 submarine cable system, making it a single-cable landing in Denmark's international connectivity infrastructure.

Connected submarine cables

CableRFSLengthOwners
Hronn2022270 kmShefa

Connectivity profile

From TotalEnergies Tyra, Denmark, international traffic can reach 1 countries through 1 cable system. Destinations include Denmark. This location depends on a single cable system — a characteristic that makes it strategically sensitive to physical disruptions.

Monitoring status

No monitoring incidents were recorded on cables serving TotalEnergies Tyra, Denmark in the past 90 days — all connected systems remained within normal latency thresholds. Our monitoring network continuously samples latency from external probes to targets reachable via these cables.

About the cables

  • Hronn (2022) — Hronn is a submarine cable system operating within Denmark, with landing points at Fano, TotalEnergies Halfdan, TotalEnergies Tyra. It provides dedicated submarine fiber capacity between these locations, supporting telecommunications, internet access, and enterprise connectivity. Read more →

Submarine cable data from TeleGeography. Monitoring metrics updated continuously by GeoCables.

Other Landing Points in Denmark

FAQ

Which submarine cable lands at TotalEnergies Tyra, Denmark?
The Hronn submarine cable is the only cable that lands at TotalEnergies Tyra, Denmark.
When was the first cable laid at TotalEnergies Tyra, Denmark?
The Hronn cable system began operations in 2022.
What geographic role does TotalEnergies Tyra, Denmark play in submarine cables?
TotalEnergies Tyra, Denmark serves as a single-cable landing point that connects international traffic to destinations within Denmark.
Which operators own the cable at TotalEnergies Tyra, Denmark?
The Hronn submarine cable is owned by Shefa Connectivity.
What are the RTT and latency measurements for connections from TotalEnergies Tyra, Denmark?
According to RIPE Atlas measurements, the Round Trip Times (RTTs) range from 15ms to 20ms with an average of approximately 17ms.

Landing Point

  • CountryDK Denmark
  • Coordinates55.4187°N 4.5131°E
  • Connected Cables1

See Real Cable Routes

View actual submarine cable routing from TotalEnergies Tyra, Denmark — with backbone nodes, distance calculations, and latency estimates

Open Calculator →
🌊 Submarine cables 🛤 Land fiber 📡 RIPE Atlas

🌐 Log In

Access your routes, favorites, and API key

Create account Forgot password?