300 km · 0 Landing Points · Ready for Service: 2005
| Length | 300 km |
|---|---|
| Status | In Service |
| Ready for Service | 2005 |
| Landing Points | 0 |
| Countries | 0 |
Link 4 Phase-2 is a regional submarine cable system that operates entirely within Indonesia, connecting two landing points over a total length of 300 km. The cable became Ready for Service (RFS) in 2005 and remains the sole operator.
Mentigi, Indonesia
Sungailiat, Indonesia
XLSmart
The cable became Ready for Service (RFS) in 2005. The status is unknown.
Indonesia, the world's largest archipelago with over 17,000 islands, relies heavily on domestic submarine cables to connect its geographically dispersed population. Link 4 Phase-2 connects two landing points within Indonesia, supporting telecommunications and internet access.
XLSmart, a subsidiary of Xelcom Group, is one of the leading telecommunications companies in Indonesia, providing services across the country. The company operates under the umbrella of Xelcom, which has been active since 1987 and offers a range of communication solutions to both residential and business customers.
The cable's route through Mentigi and Sungailiat highlights the importance of these landing points in supporting local connectivity needs. The presence of Link 4 Phase-2 underscores the ongoing efforts to improve telecommunications infrastructure within Indonesia, particularly in regions with sparse population and limited terrestrial network coverage.
Indonesia serves as a transit point for various international routes, facilitating data exchange between Southeast Asian nations and other parts of Asia. The cable's location within this strategic corridor supports regional connectivity and enhances the reliability of communication networks across the archipelago.
Find the actual cable routing distance between any two cities
Open Calculator →