95 km · 2 Landing Points · 2 Countries · Ready for Service: 2001
| Length | 95 km |
|---|---|
| Status | In Service |
| Ready for Service | 2001 |
| Landing Points | 2 |
| Countries | 2 |
| Location |
|---|
| Kungsbacka, Sweden |
| Saeby, Denmark |
GlobalConnect 2 (GC2) is a regional submarine cable spanning 95 km, connecting Saeby in Denmark with Kungsbacka in Sweden. The cable was ready for service in 2001 and has been operated by its sole owner, GlobalConnect.
Saeby, Denmark:
Kungsbacka, Sweden:
The cable is operated by GlobalConnect, a telecommunications company that provides various services in the region.
GlobalConnect 2 (GC2) entered service in 2001. The status of the cable is unknown.
This submarine cable connects Denmark and Sweden, providing a direct fiber-optic path between the two countries. It contributes to the redundancy and reliability of regional internet infrastructure by offering an alternative route for data transmission.
The corridor served by this cable is part of the broader trans-Nordic infrastructure that facilitates communication and data exchange between these two countries, supporting various industries including finance, e-commerce, and digital services.
Denmark, as a key player in Europe, has a strong telecommunications sector with operators like TDC (Telefonica Denmark) and Telia Company.
Sweden, similarly, is an important market with its own leading operators like Telia Company, which has a strong presence in both domestic and international markets. This connection enhances the overall network resilience by providing a direct link between these two countries, reducing latency, and improving data transfer speeds.
The corridor connects two significant economic hubs in Northern Europe, facilitating trade and communication across borders.
Find the actual cable routing distance between any two cities
Open Calculator →